日本一本道不卡视频在线大全

      1. <code id="jjto2"><nobr id="jjto2"><sub id="jjto2"></sub></nobr></code>
        <big id="jjto2"><em id="jjto2"></em></big>

            <strike id="jjto2"></strike>

            <tr id="jjto2"></tr>
            Data Center Map

            Mobily Tier-3 Jeddah


            » Index » Saudi Arabia » Jeddah » Mobily Tier-3 Jeddah

            Mobily Tier-3 Jeddah is located in the area Jeddah, Saudi Arabia (Kingdom of Saudi Arabia (KSA)), and the colocation data center is carrier neutral. The data center was last updated on 21-01-2014.


            Address:
            Mobily
            Jeddah
            5863 Fayah
            Saudi Arabia

            » Request quote
            » Visit website

            Click here to find other data centers
            owned and operated by Mobily.


            Profile
            Tenants
            Connectivity
            Request quote
            Office space
            Rack Cabinets
            Dedicated Servers
            Suites
            Footprints
            Virtual Servers
            Cages
            Hosting of individual servers
            Remote Hands

            Profile


            MECHANICAL SYSTEMS
            ---------------------------
            a-Cooling system Chilled water cooling system, dual flow and return with isolating valves at each T section.

            b- CRAH redundancy N+1, Data Center equipment demand cooling load is 1000 W/m2

            c-Fuel Oil Generator fuel oil storage 67 hours capacity at 100% load.

            d-BMS Computerized Building Management System M&E equipment verification and management.

            ELECTRICAL SYSTEMS
            ---------------------------
            a.Design load: The electrical connected load is 10.75 MVA with a demand load of 9 MVA.

            b-Transformers: 8 x 2500 kVA power transformer, 380/220V, 3P, 4W 60 Hz.

            c-Generators: 5 x 2000 kVA/1600 kW Continuous Rated Diesel Generators, Design in N+1.

            d-Paralleling Switch gear: Two set of paralleling switch gear for concurrently maintainable requirements monitored and controlled by two separate Load Shedding Panel.

            e- UPS: parallel redundant system in N+N configuration, 200KVA modular units with 30 minute battery autonomy at full load. 1000 W/m2 for Data Center.

            f- Rectifier System Active + Active System, (N+N) at 200 W/m2, 1000 Ah for 2 hrs + 2hrs battery autonomy time.

            g-Security System: IP access control system and IP CCTV integrated with BMS for On-Off Status only as per Security Department requirement.


            Mobily Tier-3 Jeddah Pricing/Quotes


            If you are interested in receiving a quote for Mobily, please try our free quote service.

            Copyright © Data Center Map - Sitemap
            Your guide to colocation data centers, managed hosting, cloud servers etc.
            日本一本道不卡视频在线大全
              1. <code id="jjto2"><nobr id="jjto2"><sub id="jjto2"></sub></nobr></code>
                <big id="jjto2"><em id="jjto2"></em></big>

                    <strike id="jjto2"></strike>

                    <tr id="jjto2"></tr>